Shutting it Down: Gas Valve Shut-Off & Isolation Sequence

We present you with two gifts.

The first is an internal document from TransCanada that details valve shut-off and isolation procedures for TransCanada compressor station #209 on Rymal Rd in so-called Hamilton, ON.

The second is a collection of uncensored internal TransCanada documents that detail various station shut down and isolation procedures including valve sequence operations and terminal layout maps for the “Maple” mainline which runs through so-called southern ontario. You will need to rotate the file for proper viewing. Also contains personal employee contacts.

 

PLEASE NOTE: both of these documents are hosted via NoBlogs and are NOT external links.